upload
California Energy Commission
Industri: Energy
Number of terms: 9078
Number of blossaries: 0
Company Profile:
California’s primary energy policy and planning agency
Petroleum products that are burned to produce heat or power.
Industry:Energy
The Energy Commission's strategy to respond to impending energy emergencies such as curtailment or shortage of fuel or power because of natural disasters or the result of human or political causes, or a clear threat to public health, safety or welfare. The contingency plan specifies state actions to alleviate the impacts of a possible shortage or disruption of petroleum, natural gas or electricity. The plan is reviewed and updated at least every five years, with the last plan being adopted in 1993. Legislative authority for the California Energy Shortage Contingency Plan is found in Public Resources Code, Section 25216.5.
Industry:Energy
Steps taken to reduce power demand at peak load times or to shift some of it to off-peak times. This may be with reference to peak hours, peak days or peak seasons. The main thing affecting electric peaks is air-conditioning usage, which is therefore a prime target for load management efforts. Load management may be pursued by persuading consumers to modify behavior or by using equipment that regulates some electric consumption.
Industry:Energy
Process of obtaining energy from animal wastes. This is a type of biomass energy.
Industry:Energy
The means for obtaining usable, fissionable material from spent reactor fuel.
Industry:Energy
The most direct physical transmission tie between two interconnected entities. When utility systems interchange power, the transfer is presumed to take place across the "contract path," notwithstanding the electrical fact that power flow in the network will distribute in accordance with network flow conditions. This term can also mean to arrange for power transfer between systems. (See also Parallel path flow)
Industry:Energy
Ratio of actual electricity consumed and total potential consumption. Used when analyzing electricity consumption in a large population. A loading factor of 0.5 means that 50% of homes are consuming all of the electricity they are able or that, on average, all of the homes are only consuming 50% of the power they have the potential to consume.
Industry:Energy
The greatest of all demands of the electrical load which occurred during a prescribed interval in a calendar year.
Industry:Energy
A long slender tube that holds fissionable material (fuel) for nuclear reactor use. Fuel rods are assembled into bundles called fuel elements or assemblies, which are loaded individually into the reactor core.
Industry:Energy
A type of bilateral contract where the electric generation seller is paid a fixed amount over time which is a combination of the short-term market price and an adjustment with the purchaser for the difference. For example, a generator may sell a distribution company power for ten years at 6-cents/kilowatt-hour (kWh). That power is bid into Poolco at some low /kWh value (to ensure it is always taken). The seller then gets the market clearing price from the pool and the purchaser pays the producer the difference between the Poolco selling price and 6-cents/kWh (or vice versa if the pool price should go above the contract price).
Industry:Energy