upload
U.S. Energy Information Administration
Industri: Energy
Number of terms: 18450
Number of blossaries: 0
Company Profile:
The Montreal Protocol on Substances that Deplete the Ozone Layer (1987). An international agreement, signed by most of the industrialised nations, to substantially reduce the use of chlorofluorocarbons (CFCs). Signed in January 1989, the original document called for a 50-percent reduction in CFC use by 1992 relative to 1986 levels. The subsequent London Agreement called for a complete elimination of CFC use by 2000. The Copenhagen Agreement, which called for a complete phase out by January 1, 1996, was implemented by the U.S. Environmental Protection Agency.
Industry:Energy
A purchase contract under which at least one delivery of material is scheduled to occur during the second calendar year after the contract-signing year. Deliveries also can occur during the contract-signing year, during the first calendar year there after, or during any subsequent calendar year.
Industry:Energy
A grade of unleaded gasoline with an octane rating intermediate between "regular"and "premium." Octane boosters are added to gasolines to control engine pre-ignition or "knocking" by slowing combustion rates.
Industry:Energy
A complex mixture of relatively volatile hydrocarbons with or without small quantities of additives, blended to form a fuel suitable for use in spark-ignition engines. Motor gasoline, as defined in ASTM Specification D 4814 or Federal Specification VV-G-1690C, is characterised as having a boiling range of 122 to 158 degrees Fahrenheit at the 10 percent recovery point to 365 to 374 degrees Fahrenheit at the 90 percent recovery point. Motor Gasoline includes conventional gasoline; all types of oxygenated gasoline, including gasohol; and reformulated gasoline, but excludes aviation gasoline. Note: Volumetric data on blending components, such as oxygenates, are not counted in data on finished motor gasoline until the blending components are blended into the gasoline.
Industry:Energy
The range from base load to a point between base load and peak. This point may be the midpoint, a percent of the peak load, or the load over a specified time period.
Industry:Energy
Mechanical mixing of motor gasoline blending components, and oxygenates when required, to produce finished motor gasoline. Finished motor gasoline may be further mixed with other motor gasoline blending components or oxygenates, resulting in increased volumes of finished motor gasoline and/or changes in the formulation of finished motor gasoline (e.g., conventional motor gasoline mixed with MTBE to produce oxygenated motor gasoline).
Industry:Energy
The movement of electric power from generator to load by dividing along multiple parallel paths; it especially refers to power flow along an un intended path that loops away from the most direct geographic path or contract path.
Industry:Energy
An electric generating plant with output controlled by the natural variability of the energy resource rather than dispatched based on system requirements. Intermittent output usually results from the direct, non-stored conversion of naturally occurring energy fluxes such as solar energy, wind energy, or the energy offree-flowing rivers (that is, run-of-river hydroelectricity).
Industry:Energy
Naphthas (e.g., straight-run gasoline, alkylate, reformate, benzene, toluene, xylene) used for blending or compounding into finished motor gasoline. These components include reformulated gasoline blend stock for oxygenate blending (RBOB) but exclude oxygenates (alcohols, ethers), butane, and pentanes plus. Note Oxygenates are reported as individual components and are included in the total for other hydrocarbons, hydrogens, and oxygenates.
Industry:Energy
Any loss in service for greater than 15 minutes by an electric utility of firm loads totaling more than 200 MW, or 50 percent of the total load being supplied immediately prior to the incident, whichever is less. However,utilities with a peak load in the prior year of more than 3000 MW areonly to report losses of service to firm loads totaling more than 300 MW for greater than 15 minutes. (The DOE shall be notified with service restoration and in any event, within three hours after the beginning of the interruption.)
Industry:Energy