
Home > istilah-istilah > Bahasa Albania (SQ) > vlera e fituar
vlera e fituar
The value of completed work expressed in terms of the approved budget assigned to that work for a schedule activity or work breakdown structure component. Also referred to as the budgeted cost of work performed.
0
0
Perbaiki
- Part of Speech: kata benda
- Sinonim (s):
- Blossary:
- Industri / Domain: Layanan bisnis
- Kategori: Pengelolaan proyek
- Company: WSDOT
- Produk:
- Akronim-Singkatan:
Bahasa Lain:
Apa yang ingin Anda katakan?
Istilah-istilah dalam Berita
Istilah Terpilih
Industri / Domain: Bar & klub malam Kategori:
klub nate
Gjithashtu i njohur thjeshtë si klub, diskotekë ose disko është një vendngjarje argëtuese që zakonisht vepron deri natën vonë. Një klub nate dallohet ...
Kontributor
Daftar istilah utama
Sherif Saad
0
istilah-istilah
1
Daftar Istilah
0
pengikut
Azazeel
Kategori: Literatur 1
3 istilah-istilah


tim.zhaotianqi
0
istilah-istilah
40
Daftar Istilah
4
pengikut
Hotel management Terms
Kategori: Business 1
2 istilah-istilah

Browers Terms By Category
- Berkebun(1753)
- Dekorasi di luar ruangan(23)
- Teras & halaman(6)
- Peralatan berkebun(6)
- Baberqueue(1)
- Perlengkapan berkebun(1)
Taman(1790) Terms
- Arsitektur secara umum(562)
- Jembatan(147)
- Castles(114)
- Rancangan lansekap(94)
- Arsitektur kontemporer(73)
- Pencakar langit(32)
Arsitektur(1050) Terms
- Material physics(1710)
- Metalurgi(891)
- Teknik korosi(646)
- Magnetics(82)
- Pengujian pengaruh(1)
Sains material(3330) Terms
- Pengobatan(68317)
- Pengobatan kanker(5553)
- Penyakit(4078)
- Genetic disorders(1982)
- Managed care(1521)
- Optometri(1202)