Ključna putanja

Generally, but not always, the sequence of schedule activities that determines the duration of the project. Generally, it is the longest path through the project. However, a critical path can end, for example, on a schedule milestone that is in the middle of the project schedule and that has a finish-no-later-than imposed date schedule constraint. See also critical path method.

0
Tambah ke Daftar Istilah Saya

Apa yang ingin Anda katakan?

Anda harus log masuk untuk membalas diskusi.

Istilah-istilah dalam Berita

Istilah Terpilih

Vesna Kovacevic
  • 0

    istilah-istilah

  • 0

    Daftar Istilah

  • 3

    pengikut

Industri / Domain: Psikologi Kategori: Analisa perilaku

grčevi u želucu

Stanje bića - potišteno ili zlovoljano ponašanje, pojavljuju se grčevi, ili razdražljivost. Izvorno značenje ove riječi izvedena iz migrena, što znači ...

Kontributor

Daftar istilah utama

Hogwarts School of Witchcraft and Wizardry

Kategori: Hiburan   2 5 istilah-istilah

Morocco's Weather and Average Temperatures

Kategori: Perjalanan   1 4 istilah-istilah