Home > istilah-istilah > Bahasa Bosnia (BS) > Ključna putanja

Ključna putanja

Generally, but not always, the sequence of schedule activities that determines the duration of the project. Generally, it is the longest path through the project. However, a critical path can end, for example, on a schedule milestone that is in the middle of the project schedule and that has a finish-no-later-than imposed date schedule constraint. See also critical path method.

0
Tambah ke Daftar Istilah Saya

Apa yang ingin Anda katakan?

Anda harus log masuk untuk membalas diskusi.

Istilah-istilah dalam Berita

Istilah Terpilih

ivysa
  • 0

    istilah-istilah

  • 0

    Daftar Istilah

  • 4

    pengikut

Industri / Domain: Makanan (lain-lain) Kategori: Tanaman obat & bumbu

korijander

spice (whole or ground) Description: Seeds from the coriander plant, related to the parsley family (see cilantro). Mixture of lemon, sage and caraway ...

Kontributor

Daftar istilah utama

Catholic Devotions

Kategori: Agama   1 18 istilah-istilah

Shakespeare's Vocabulary

Kategori: Literatur   6 20 istilah-istilah