Metoda ključne putanje (CPM)

A schedule network analysis technique used to determine the amount of scheduling flexibility (the least amount of float) on various logical network paths in the project schedule network, and to determine the minimum total project duration. Early start and finish date are calculated by means of a forward pass using a specified start date. Late start and finish dates are calculated by means of a backward pass, starting from a specified completion date, which sometimes is the project early finish date determined during the forward pass calculation.

0
Tambah ke Daftar Istilah Saya

Apa yang ingin Anda katakan?

Anda harus log masuk untuk membalas diskusi.

Istilah-istilah dalam Berita

Istilah Terpilih

ivysa
  • 0

    istilah-istilah

  • 0

    Daftar Istilah

  • 4

    pengikut

Industri / Domain: Biologi Kategori: Anatomi

grkljan

The larynx (plural larynges), commonly called the voice box, is an organ in the neck of mammals involved in protecting the trachea and sound ...

Kontributor

Daftar istilah utama

Azazeel

Kategori: Literatur   1 3 istilah-istilah

Hotel management Terms

Kategori: Business   1 2 istilah-istilah