Home > istilah-istilah > Bahasa Bosnia (BS) > Metoda ključne putanje (CPM)

Metoda ključne putanje (CPM)

A schedule network analysis technique used to determine the amount of scheduling flexibility (the least amount of float) on various logical network paths in the project schedule network, and to determine the minimum total project duration. Early start and finish date are calculated by means of a forward pass using a specified start date. Late start and finish dates are calculated by means of a backward pass, starting from a specified completion date, which sometimes is the project early finish date determined during the forward pass calculation.

0
Tambah ke Daftar Istilah Saya

Apa yang ingin Anda katakan?

Anda harus log masuk untuk membalas diskusi.

Istilah-istilah dalam Berita

Istilah Terpilih

irena sabovic
  • 0

    istilah-istilah

  • 0

    Daftar Istilah

  • 4

    pengikut

Industri / Domain: Literatur Kategori: Novel

Državne nagrade za književna djela

American literary awards, running annually from 1950 to present. There are 4 awards, fiction, nonfiction, poetry, and young people's literature, with ...

Kontributor

Daftar istilah utama

Julius Caesar

Kategori: Pendidikan   1 20 istilah-istilah

Pain

Kategori: kesehatan   1 6 istilah-istilah