Home > istilah-istilah > Bahasa Serbia (SR) > Хуверова брана

Хуверова брана

Named one of the Top 10 Construction Achievements of the 20th Century, Hoover Dam was the largest of its kind at the time and many years after. Despite the remote location and harsh working conditions, construction begain in 1930 and the dam was completed in less than five years -- two years ahead of schedule -- and well under budget.

The dam is named after America's 31st president, Herbert Hoover, who played a large role in bringing the nearby states into agreement about water allocations, settling a 25-year controversy. The dam has been called Boulder Canyon Dam as well as Boulder Dam, but Hoover Dam was reinstated as the official name by Congress in 1947.

The impressive newly built Hoover Dam bypass bridge, perched 890 feet above the turquoise Colorado River, officially opens to traffic in October, 2010,

0
Tambah ke Daftar Istilah Saya

Apa yang ingin Anda katakan?

Anda harus log masuk untuk membalas diskusi.

Istilah-istilah dalam Berita

Istilah Terpilih

sladjana milinkovic
  • 0

    istilah-istilah

  • 0

    Daftar Istilah

  • 3

    pengikut

Industri / Domain: Bahasa Kategori: Istilah

Трка језика

One of the first online language competitions that allows users to add terms and definitions in their native languages at TermWiki.com in order to ...

Kontributor

Daftar istilah utama

Quality Management

Kategori: Pendidikan   1 4 istilah-istilah

iPhone 6 Plus

Kategori: Teknologi   4 43 istilah-istilah