A project management technique for determining how much time a project needs before it is completed. Each activity is assigned a best, worst, and most probable time estimate. These are used to determine the average completion time, which is used to figure the critical path and completion time for the project.

0
Tambah ke Daftar Istilah Saya

Apa yang ingin Anda katakan?

Anda harus log masuk untuk membalas diskusi.

Istilah-istilah dalam Berita

Istilah Terpilih

ivysa
  • 0

    istilah-istilah

  • 0

    Daftar Istilah

  • 4

    pengikut

Industri / Domain: Makanan (lain-lain) Kategori: Tanaman obat & bumbu

limun trava

herb (fresh or dried stalks or ground) Description: Long, thin, gray-green leaves. Lemon flavor and fragrance, very fibrous. Uses: Fish, chicken, ...

Kontributor

Daftar istilah utama

The Kamen Rider TV Series

Kategori: Hiburan   1 25 istilah-istilah

Bugs we played as children

Kategori: Hewan   3 3 istilah-istilah

Browers Terms By Category